Product Category menu

Category background

Lightweight

Product Thumnail Image Zoom

[Basic Infomation]
Trader

[Aerotech Korea Co., Ltd.]

  • South Korea South Korea
  • KITA MEMBER
Add to My Interests Send Inquiry
Product Detail Information
SBH lightweight steel shoring is chosen all over the world as the preferred shoring system for small to middle-sized trenches and use of light excavators, this system is versatile and is particularly suitable for strut clearances up 1.00 metre, supply lines and service lines.
  • Strut clearance up to 1.00 metre
  • Installation depth up to 3.9 meters
  • Trench width up to 2.23 meters

The base plates are available in various lengths, from 2.00 meters up to 3.5 meters and various heights, form 1.6 meters up to 2.60 meters.
Beeper trenches can be shored using top boxes.

  • Small to middle-sized trenches
  • Supply lines
  • Service lines

An all-rounder
4 different strut types make SBH lightweight shoring a real all-rounder in its field. Depending on the job, trench widths between 65 centimeters and 2.23 meters can be shored safely.

The SBH Light Weight Shoring is suited for small to middle sized trench construction and the usage of light construction machinery.

Light weight shoring is applicable variably and without problems, best suited for supply lines, house connections and cable laying.

Easily mounted struts, elastically located in the plate profile allow a quick assembly and easy installation with place and adjust method.

Installation depth up to: 3,00m
Trench width: 0,65 - 2,23m

Specificatioin

Year
Client
Construction CO.
Project Name
2006
Environmental
Management
Corporation
(E.M.C)
GS Construction Co. Han-River Water System Sewer Pipe Maintenance Works
2nd Section of Works(Nan Yang Ju)
2005
Pohang-si GS Construction Co. GuRyongPo Sewer Pipe Maintenance Works
2005
Encironmental
Management
Corporation
(E.M.C)
GS Construction Co. Han-River Water System Sewer Pipe
Maintenance Works:
2nd Section(Nam Yang Ju)
2004
Environmental
Management
Corporation
(E.M.C)
GS Construction Co. Han-River Water System Sewer Pipe
Maintenance Works:
2nd Section(Nam Yang Ju)