Product Category menu

Category background

Single Slide Rail

Product Thumnail Image Zoom

[Basic Infomation]
Trader

[Aerotech Korea Co., Ltd.]

  • South Korea South Korea
  • KITA MEMBER
Add to My Interests Send Inquiry
Product Detail Information
This system offers a slide rail with one guide for the shoring plates.
So trench depths of max. 3.80 m can be realized.
Same like the other shoring systems, also here the compatible rolling struts can be used and offer thereby a wide range of application.
When laying pipes with over length the rolling struts can be positioned staggered in height so that they allow the putting in of the pipes.

The usage of the Single Slide Rail Shoring takes place especially in middle sized trench construction where high strut clearances are required and the terrain tends to settings. By bringing in a soil support also larger strut clearance heights can be made possible and with our patented adjustable clamping device even strut-free shoring pits are realizable.

Pits and trench ends can be closed all around by means of corner slide rails and shoring plates.

Installation depth up to: 3,80m
Trench width: 1,99 - 12,00m
Plate length: up to 6,00m
Spindle clearance height: up to 2,73m

Specificatioin

Year
Client
Construction CO.
Project Name
2006
E.M.C SunJin Construction Co. YeCheon Sewer Pipe Maintenance Works
SamSung Electronic Co. SamSung Heavy Industries Co. TangJeong Industry Complex Utility Pipe Works
GimHae-Si HwangBo Construction Co. GimHae JeonHa-Dong Sewer Pipe Works
KyungSan-Si HanJin I&C Co. KyoungSan-Si Sewer Pipe Maintenance Works
2005 KyeongSan-Si HanJin I&C Co. GyeongSan-Si JungAng-Section Sewer Pipe Maintenance Works
KyeongSan-Si IC Corporation GyeongSan-Si JungAng-Section Sewer Pipe Maintenance Works
JeongSeon-Gun
DaeJeo Construction Co. Sewer Pipe Maintenance Works
Korean Lan Co. NamYang Construction Co. HwaSeong-DongTan Land
Development 3rd Section Electric Power Utility Works
E.M.C Lotte Construction Co. GiJang Sewer Pipe Maintenance Works